A Gantt chart template you change in place.
Open a ready Gantt chart template in your browser, nothing uploaded: change its tasks and dates, then save a PDF, an Excel file or a link.
By Suraj Kumar3 min read
A template saves you from a blank page: a plan with groups, waits and milestones already in place, that you only have to change.
A real plan to start from.
The template opens on a website redesign that starts this week: a kick-off, goals, a content audit, a sitemap, wireframes, visual design, building, writing, testing and the launch, in four groups, with each task waiting for the one before it and three milestones.
Rename a task, change its dates or days, or delete it, and the chart is drawn again as you type. Add a task or a milestone after any task, and it starts the day after that one ends and waits for it.
Groups as bands of colour.
Type a group or phase on each task. Tasks of a group that follow one another are drawn under one band, in one colour, with a thin bar across the days the group runs. The colours are held to 3:1 against the white page, so they show when printed.
If you would rather have one colour, choose it under More options. Red is kept for today's line and for tasks that start before what they wait for ends, so a warning never looks like a group.
From Excel and back.
If your plan already lives in a spreadsheet, start again and choose Paste or open a list: paste the rows or open the CSV or Excel file, and your own tasks are drawn the same way, in bands by their groups.
Saved as Excel, the plan's starts and ends are real dates and its progress real percentages, so they sort and add up there. Saved as CSV, it reads back into the Gantt chart maker with the same tasks, dates and waits.
Keep it, or carry it in a link.
Turn on Keep my plan on this device under More options and the plan is kept in this browser only, until you turn it off; it is off every time the page opens, and a kept plan is offered when you come back, never opened unasked.
Copy a link, or show it as a QR code, to open the plan on another device. The plan travels after the #, which browsers never send anywhere, so anyone with the link can open the plan and no server ever sees it.
Further reading
Topics: gantt chart template · free gantt chart template · project plan template · gantt chart example · project schedule template · gantt chart excel template
A little less theory. A little more doing.
Try it on your own terms, with a free browser tool.
Try the tool