A Gantt chart that warns, and never moves your dates.
Make a Gantt chart in your browser, nothing uploaded: tasks, milestones, waits drawn as arrows, then a PDF, PNG, SVG, CSV or Excel file.
By Suraj Kumar3 min read
A Gantt chart puts each task of a project on its own row, as a bar from the day it starts to the day it ends, so you can see at a glance what runs when and what has to wait.
Start the way that suits you.
The Gantt chart maker asks one question first: how do you want to start? A blank plan gives you one task to fill in, an example project gives you a ready plan of a website redesign to change, and a list lets you paste rows from a spreadsheet or open a CSV or Excel file.
A list can name its columns in its first row (Task, Start, End, Days, Progress, Group, Waits for) in any order. Dates may be written as 2026-12-07, 7 Dec 2026 or 07/12/2026; when a date like 03/04/2026 could be read either way, the page says which way it read them.
Tasks, milestones and waits.
Each task has a start, an end or a number of days, how much of it is done and a group or phase. A task of 0 days is a milestone, drawn as a diamond on its date. Tasks of the same group are drawn under a coloured band, and you put tasks in order with their arrow buttons or with Alt and the up or down arrow key.
A task can wait for others. The chart draws an arrow from the end of each one it waits for to its start. When a task starts before what it waits for ends, its bar and arrow turn red and the page names both, with the day it could start. Nothing is moved unless you press Move it, or move every late task at once.
Days, weeks or months, and working days.
The chart is drawn by days, weeks or months, chosen to fit how long the plan runs, or as you choose under More options. A line marks today when today falls inside the plan, and weekends are shaded when the chart is drawn by days.
With Working days only on, a task's days count only the days that are not the weekend, so a five-day task that starts on a Thursday ends the next Wednesday. The weekend comes from your browser's region and can be changed; public holidays are not counted. Every date is a plain calendar day, so no time zone can move one.
One drawing, every file.
The chart is drawn once, with its words as the outlines of the site's own fonts, and that one drawing is the preview, the PNG, the SVG and the PDF. The PDF is landscape A4 or US Letter; a long chart is printed full size on pages to lay side by side, or shrunk onto one page if you ask.
The plan itself can be saved as CSV or as an Excel workbook whose dates and progress are real dates and percentages there. A link carries the whole plan after the #, which browsers never send to a server, so anyone with the link can open the plan and nothing is uploaded.
Further reading
Topics: gantt chart maker · make a gantt chart · free gantt chart · gantt chart online · project schedule · task dependencies · gantt chart pdf
A little less theory. A little more doing.
Try it on your own terms, with a free browser tool.
Try the tool