Work out concrete and bags

Type the slab's size, or choose a footing, post holes or steps. Bags are counted from the yield the maker publishes, and rounded up.

Measures
MetricUS (feet, inches)
What are you pouring?
SlabFootingPost holesSteps
6 m3 m10 cm

You need

1.98 m³

Concrete for a slab comes to 1.98 m³: 117 bags of 36.2 kg (80 lb) concrete mix.

Bags of premixed concrete
36.2 kg27.2 kg22.6 kg18.1 kg40.8 kgMy bag's yield

To buy

  • 117 × bag of 36.2 kg (80 lb) concrete mix
  • or 1.98 m³ of ready-mixed concrete

The same in other units

  • 1,980 L
  • about 2.59 cu yd
  • about 69.92 cu ft

How it is worked out

  1. Volume: 6 m × 3 m × 0.1 m = 1.8 m³.
  2. With 10% extra for waste: 1.8 m³ × 1.1 = 1.98 m³.
  3. Bags: 1,980 L ÷ about 16.99 L a bag = about 116.54, rounded up to 117 bags, as you cannot buy part of one.
  • An 80 lb bag yields about 0.6 cu ft (about 17 L), as the maker's data sheet says. Other makers' bags of the same weight may differ: check the bag.
How it works and help
Every amount is worked out exactly on your device, from the Unit converter's factors. Nothing you type is sent anywhere.

A little help along the way

Follow these steps. Every option is explained underneath. Everything is worked out in your browser; nothing is sent anywhere.

  1. Say what you are working outConcrete, an area, gravel or soil, mulch, paint or tiles. Metric or US measures are chosen from your region first; change them above the form.
  2. Type your measurementsA bare number is in the unit shown in the field. You can also type units with it: 12 ft 6 in, 12'6", 3.8 m or 450 mm. An area can be made of several rectangles, triangles and circles, and a part can be taken away.
  3. Read what to buyThe amount comes in words with the working on your numbers. Bags, cans, tiles and boxes are rounded up, as you cannot buy part of one. Copy the shopping list to take with you.

Questions people ask

How many bags of concrete do I need for a slab?
Multiply length, width and thickness for the volume, add some for waste, and divide by what one bag yields. A 10 by 12 ft slab 4 in thick is 40 cu ft; with 10% extra that is 44 cu ft, or 74 bags of 80 lb mix at 0.60 cu ft a bag, rounded up.
Where does the yield of a bag come from?
From the maker's own data sheet for its concrete mix, which gives about 0.60 cu ft for an 80 lb bag and 0.45 cu ft for a 60 lb bag; the page names it and the day it was read. If your bag says something else, choose My bag's yield and type it.
Can it work out post holes and steps?
Yes. Choose Post holes for round holes or columns, with how many and a square post set in each, or Steps for a flight of solid steps by their height, depth and width. The working shows every multiplication.

This page is the Home project calculator, opened for this one job; every other tool it has is one press away. Each of its settings is explained on the Home project calculator's own page.